Yes, in order for the Work to synchronise back to SAP without any errors, every section needs to be completed.
-
How do I raise a SAP PO Notification?
-
How do I raise a SAP PM Notification?
-
In a Task Assignment, what are the Tabs at the bottom of the screen?
-
Will I be able to do my work offline?
-
Sync Error on Obzervr Capture
-
How can I assign myself to execute work associated with Follow-on Breakdown in Capture?
-
When should I fill out the Follow-On Work fragment in Capture?
-
How many characters can be entered into different free text (notes) fields?
-
If I accidentally select the wrong adhoc Work Template, how do I go about cancelling it?
-
Will I be able to order parts through the Pick List?
Comments
0 comments
Please sign in to leave a comment.